This project, valued at $60 M (contract only) consisted of a 1,200 m long crossing of the Murrumbidgee River and flood plain.
- This project, valued at $60 M (contract only) consisted of a 1,200 m long crossing of the Murrumbidgee River and flood plain and associated dual carriageway Hume Highway approaches, at Gundagai south western NSW.
- The river crossing bridge was a three span balanced cantilever structure. The adjoining floodplain bridge consisted a 27 x 40 m span prestressed I beam structure in linked slabs designed in groups of 6 span trestles.
- The road works consisted on regrading and re-paving the existing 2 lane northbound carriageway of the Hume Highway and the construction of a new 2 lane southbound carriageway utilising flexible pavements and deeplift AC.
|