The Northern Road Stage 1 for RMS Western Sydney Project Office (WSPO)

 

The project: Construction works involve the conversion of the existing single carriageway road to dual carriageways and the provision of traffic signals at the intersections with Porrende Street/Fairwater Drive, Hillside Drive and Cobbitty Road West.

 

Project Description:

Contract:  MR154, The Northern Road Upgrade, Old Narellan Road to Peter Brock Drive

Contract Number:   14.2613.0982;  Contractor:  Georgiou

Contract Value:  $57,687,000 (excluding GST), extended to over $80M by variation

Commencing work on site 18 February 2016, with Duration 102 weeks

 

WSPO 01

 

 

The main construction contract work items include:

  • Traffic management including staging,
  • Environmental management including erosion and sedimentation control and vegetation,
  • Clearing and grubbing including demolition of existing pavements and structures,
  • Earthworks, embankment construction, subgrade preparation Selected Material Zone,
  • Stormwater and subsurface drainage’
  • Flexible and rigid pavement construction and resurfacing of existing pavements,
  • New three span bridges approximately 46.5 metres long over Narellan Creek NB and SB,
  • Extensive Utility adjustments, and
  • 5km of Noise Walls.

 

WSPO 02

 

PES is providing leadership of the site management team comprising:

  • Principal’s Authorised Delegate
  • Specialist programming and Claim Assessment

RMS team members:  Two engineers, two Surveillance Officers and part time admin support.